Close Menu
  • News
  • Stocks
  • Bonds
  • Commodities
  • Collectables
    • Art
    • Classic Cars
    • Whiskey
    • Wine
  • Trading
  • Alternative Investment
  • Markets
  • More
    • Economy
    • Money
    • Business
    • Personal Finance
    • Investing
    • Financial Planning
    • ETFs
    • Equities
    • Funds

Subscribe to Updates

Get the latest markets and assets news and updates directly to your inbox.

Trending Now

Art Basel Paris’s Avant Première Becomes De-Facto VIP Opening, With the Attendant Eight-Figure Sales

October 21, 2025

OpenAI’s new browser puts Google in the hot seat, and Alphabet’s stock drops

October 21, 2025

Steadright Signs MOU for Historic Polymetallic Copper-Lead-Zinc-Silver-Gold Goundafa Mine in Morocco

October 21, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
The Asset ObserverThe Asset Observer
Newsletter
LIVE MARKET DATA
  • News
  • Stocks
  • Bonds
  • Commodities
  • Collectables
    • Art
    • Classic Cars
    • Whiskey
    • Wine
  • Trading
  • Alternative Investment
  • Markets
  • More
    • Economy
    • Money
    • Business
    • Personal Finance
    • Investing
    • Financial Planning
    • ETFs
    • Equities
    • Funds
The Asset ObserverThe Asset Observer
Home»Investing
Investing

Camp Lode Deposit Delivers High-Grade, Near-Surface Graphite

News RoomBy News RoomOctober 21, 2025
Share
Facebook Twitter LinkedIn Pinterest Email

Blencowe Resources Plc (LSE: BRES), the natural resources company advancing the Orom-Cross graphite project in Uganda, is pleased to announce further assay results from its Stage 7 drilling programme at its flagship Orom-Cross graphite project in northern Uganda.

The Stage-7 campaign, the largest undertaken by the Company to-date, combined geotechnical drilling, infill drilling and exploration drilling (both step-out and deep drilling) across multiple deposits, including Camp Lode, Northern Syncline and Beehive.

The programme is designed to both expand and upgrade existing mineralisation with the infill component specifically focused on converting existing JORC Resources into Reserves for inclusion within the Definitive Feasibility Study (DFS), which remains on track for completion in Q4 2025.

Initial assays from the infill drilling at Camp Lode have delivered a sequence of strong, high-grade near-surface hits, underscoring Orom-Cross’s exceptional blend of scale, shallow mineralisation and low-cost, open-pit potential.

First results from the Northern Syncline, where drilling targeted both infill and deeper extensions, are now in final lab stages and will be reported on imminently in a separate announcement.

Highlights – Camp Lode:

  • Hole L1602: 27.49m @ 8.18% TGC; including 6.4m @ 10.19% TGC and 10.95m @ 11.13%TGC
    → Confirms high-grade continuity to the south-east.
  • Hole L1703: 25.39m @ 7.34% TGC, including 10.41m @ 11.27% TGC.
  • Hole: L1803: 27.75m @ 5.41% TGC, including 10.89m @ 9.73%TGC from surface to 12m.
  • Hole L1502: 16.26m(TW) @ 7.37% TGC from surface to 17m in depth.
  • Hole L1601: 13.63m @ 6.18% TGC.
  • Hole L1703: 27.49m @ 8.18% TGC, including 6.4m @ 10.19% TGC and 10.95m @ 11.13%TGC

Significance:

These results confirm high-grade extensions within and adjacent to the planned pit area, providing additional higher-grade tonnes that will strengthen early-stage project economics. Access to elevated-grade material early in the mine schedule is expected to enhance cash flow and shorten payback once operations commence.

Drilling Programme Integration

  • Geotechnical and infill drilling data will be combined in the updated geological model to feed detailed mine design and mine sequencing for the Definitive Feasibility Study.
  • Combined with assay results from the Northern Syncline infill this data will feed into the JORC Resource and Reserve upgrade, targeted to materially increase the mineable tonnage within the DFS.
  • Northern Syncline extensions and Beehive deposit will both deliver tonnes into a revised Orom-Cross exploration target to highlight future potential.
  • Laboratories have confirmed that Northern Syncline infill assays are being finalised, and results are expected shortly. This area hosts large-tonnage, moderate-grade mineralisation, ideal for long-term production feed and blending flexibility.

Permanent Camp Construction

Work is now nearing completion on a permanent camp at Orom-Cross, which will support further exploration in 2026 and provide facilities for contractors during mine construction. This permanent camp is scheduled for completion in late October 2025 (see Appendix).

Executive Chairman Cameron Pearce commented:

“The infill assays are beginning to come through and thus far they are excellent. The results from Camp Lode confirm further long intersections of high-grade, near-surface graphite that will strengthen early-stage project economics, while the broader Stage 7 drilling programme continues to deliver exactly what we hoped for, namely growth, continuity, and more tonnes for conversion to Reserves.

All this data will feed directly into our upgraded JORC Resource statement and the Definitive Feasibility Study, which both remain on track for completion for Q4 2025. The DFS will in turn allow us to move directly into project financing discussions, leveraging the strong relationships we have already built and opening new ones as we take Orom-Cross into Phase 1 development.

At the same time, extensive testing programmes continue to validate Orom-Cross as a globally competitive graphite source. Independent laboratories including graphite specialists Wuhan University in China and American Energy Technologies in the U.S. have confirmed SPG purities up to 99.99%, while recent SAFELOOP testing demonstrated one of the highest natural graphite loadings ever recorded in an EV battery anode at 68%. Most recently, Apollo Energy Systems in the U.S. achieved a 12% performance gain using Orom-Cross graphite in lead-acid batteries, opening another diversified large market opportunity.

These are all exceptional outcomes that reinforce the tier one quality and versatility of our product and project. They come as we near completion of the DFS, which will showcase Orom-Cross as one of the cleanest, most advanced and commercially attractive graphite projects globally.”

Preliminary drill results Camp Lode

A screenshot of a computer generated data AI-generated content may be incorrect.

Further Drilling Detail

The Company drilled 11 diamond drillholes in the Camp Lode deposit as part of a Resource infill and upgrade exercise. At Camp Lode, these holes have indicated a possible grade extension to the orebody in the south-east, with the holes infilling an area between the main drilling from the Stage 6 program and exploratory holes drilled in Stage 5 to define the probable limit of the lode. The resultant assays represent very high grades of graphite in comparison to the overall Orom-Cross resource.

The intersections from the program all occur within the area of the completed drilling with the majority of the intersection occurring within 26 meters of the surface. The ability to mine substantial volume of graphite from shallow depths contributes to Orom-Cross having operating costs sitting within the lowest percentile of graphite projects worldwide, and this is considered a major advantage as Blencowe drives towards first DFS completion and Phase 1 production.

The results from these 11 holes at Camp Lode, plus the 4 geotechnical holes recently announced, will be included within the resource model updates. The assay labs are continuing to prioritise the Orom-Cross samples and the Company expects further results shortly.

For further information please contact:

Blencowe Resources Plc

Sam Quinn

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

[email protected]

Investor Relations

Sasha Sethi

Tel: +44 (0) 7891 677 441

[email protected]

Tavira Financial

Jonathan Evans

Tel: +44 (0)20 3192 1733

[email protected]

Twitter https://twitter.com/BlencoweRes

LinkedIn https://www.linkedin.com/company/72382491/admin/

Background

Orom-Cross Graphite Project

Orom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of more valuable larger flakes within the deposit.

A 21-year Mining Licence for the project was issued by the Ugandan Government in 2019 following extensive historical work on the deposit and Blencowe is finalising the Definitive Feasibility Study phase as it drives towards first production.

Orom-Cross presents as a large, shallow open-pitable deposit, with a maiden JORC Indicated & Inferred Mineral Resource deposit of 24.5Mt @ 6.0% Total Graphite Content. Development of the resource is expected to benefit from a low strip ratio and free dig operations, thereby ensuring lower operating and capital costs.

Appendix

First permanent camp facilities nearing completion at Orom-Cross.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact [email protected] or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

Source



Read the full article here

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

Steadright Signs MOU for Historic Polymetallic Copper-Lead-Zinc-Silver-Gold Goundafa Mine in Morocco

IAMGOLD Expands Quebec Footprint With Twin Acquisitions of Northern Superior, Orbec

United States Antimony Makes Takeover Bid for Larvotto Resources

Beijing to Scrap Platinum Import Tax Rebate, Opening Market to New Entrants

New VMS Licence Award at Rulikha Deposit

Nextech3D.ai Launches Blockchain Ticketing on the Ethereum Network With Coinbase and MetaMask Integration

FCA’s Simon Walls warns ‘things will go wrong’ with PISCES but loosening regulation is right

Silver Hammer Enters into Option Agreement to Acquire 100% Interest in a Strategic and Prospective Silver Project in the Silver Valley of Idaho

Think tank unveils toolkit for investment trust boards to boost governance oversight

Recent Posts
  • Art Basel Paris’s Avant Première Becomes De-Facto VIP Opening, With the Attendant Eight-Figure Sales
  • OpenAI’s new browser puts Google in the hot seat, and Alphabet’s stock drops
  • Steadright Signs MOU for Historic Polymetallic Copper-Lead-Zinc-Silver-Gold Goundafa Mine in Morocco
  • TV Art Authenticator Claims He Was Contacted to Authenticate Stolen Louvre Jewels
  • Six Flags’ stock rallies as activist investor takes stake — with help from Travis Kelce

Subscribe to Newsletter

Get the latest markets and assets news and updates directly to your inbox.

Editors Picks

OpenAI’s new browser puts Google in the hot seat, and Alphabet’s stock drops

October 21, 2025

Steadright Signs MOU for Historic Polymetallic Copper-Lead-Zinc-Silver-Gold Goundafa Mine in Morocco

October 21, 2025

TV Art Authenticator Claims He Was Contacted to Authenticate Stolen Louvre Jewels

October 21, 2025

Six Flags’ stock rallies as activist investor takes stake — with help from Travis Kelce

October 21, 2025

Camp Lode Deposit Delivers High-Grade, Near-Surface Graphite

October 21, 2025
Facebook X (Twitter) Instagram
© 2025 The Asset Observer. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Press Release
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.