Close Menu
  • News
  • Stocks
  • Bonds
  • Commodities
  • Collectables
    • Art
    • Classic Cars
    • Whiskey
    • Wine
  • Trading
  • Alternative Investment
  • Markets
  • More
    • Economy
    • Money
    • Business
    • Personal Finance
    • Investing
    • Financial Planning
    • ETFs
    • Equities
    • Funds

Subscribe to Updates

Get the latest markets and assets news and updates directly to your inbox.

Trending Now

John Trumbull’s Declaration of Independence Painting Appears on Trump’s New US Passports

April 29, 2026

Why London’s Whitechapel Gallery Hired an Economist

April 29, 2026

Material Transfer Agreement Between Pharmaceutical Company and Lexaria is Extended

April 29, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
The Asset ObserverThe Asset Observer
Newsletter
LIVE MARKET DATA
  • News
  • Stocks
  • Bonds
  • Commodities
  • Collectables
    • Art
    • Classic Cars
    • Whiskey
    • Wine
  • Trading
  • Alternative Investment
  • Markets
  • More
    • Economy
    • Money
    • Business
    • Personal Finance
    • Investing
    • Financial Planning
    • ETFs
    • Equities
    • Funds
The Asset ObserverThe Asset Observer
Home»Investing
Investing

Lake Johnston drill program testing extensions to Xmas Gold Discovery and Medcalf Lithium Resource

News RoomBy News RoomMarch 12, 2026
Share
Facebook Twitter LinkedIn Pinterest Email

Charger Metals NL (ASX: CHR, “Charger” or the “Company”) is pleased to provide a drilling progress update at its 100%-owned Lake Johnston Lithium and Gold Project (“Lake Johnston”) in the Yilgarn, Western Australia. Charger has completed a total of 3,054m drilling this quarter to date, including 1,186m of diamond and 1,868m of RC drilling, across Medcalf Lithium Deposit, the Medcalf West Exploration Target and the Xmas Gold Discovery.


KEY HIGHLIGHTS

  • 3,054m of diamond and RC drilling completed so far this quarter at Charger’s 100%- owned Lake Johnston Lithium and Gold Project.
  • Diamond drilling is still ongoing, testing the extensions of the Medcalf Spodumene Deposit at depth to depths of 500m.
  • Following the receipt of all assay results over the coming weeks, Medcalf Lithium Resource will be revised from its current 8.2Mt @ 1.0% Li20.
  • At Xmas Gold Discovery a diamond hole and a deeper RC hole have been completed, up dip and down dip respectively, with assays pending, to test the vertical extensions of gold intersected in hole CLGRC022 (3m @ 18.0 g/t Au & 9.15 g/t Ag from 135m, including 1m @ 41.5 g/t Au & 26.5 g/t Ag).
  • A further 420 surface soil assays have been collected over the Xmas Gold Discovery area, on a 50m x 100m grid, with results pending.
  • The high-grade Xmas Gold Discovery area is very under-explored with no historical RC or diamond drilling along a trend of greater than 2km.

Charger’s Managing Director, Bryan Dixon, commented:

“The Lake Johnston greenstone belt is one of the more under-explored greenstone belts in the Yilgarn of Western Australia and does not presently host a major gold or lithium mine. So far this quarter, Charger has completed 3,054m of RC and diamond drilling at its 100% owned Lake Johnston Lithium and Gold Project, with initial samples at the laboratory awaiting assays.

“Drilling has included 2,714m of drilling seeking to extend the existing lithium resource (8.2Mt @ 1.0% Li20) at the Medcalf Lithium Resource and test the Medcalf West Exploration Target. The Charger team has also completed a further 2 holes at the Xmas Gold Discovery, targeting up dip and down dip from RC hole CLGRC022, which confirmed the extremely high-grade nature of this prospect, intercepting 3m @ 18.0 g/t Au from 135m, including 1m @ 41.5 g/t Au.

“The Xmas Gold Discovery has over 2,000m of trend that has not been drill tested previously and there had not been any drilling for gold on this tenement area for 13 years prior to Charger announcing this discovery in late December 2025.”

Medcalf Lithium Drilling targeting upgrading Mineral Resource Estimate

The current program has included 2,714m of drilling at Medcalf Spodumene Deposit, with diamond drilling ongoing and seeking to test the down dip extensions to down hole depths of 500m. Initial metallurgical and ore sorting test work over the Medcalf deposit is planned to commence following the completion of the current diamond drilling programme this month. Initial Medcalf drill samples are at the laboratory awaiting assays, with results, and metallurgical test work results, to be used to calculate an update of the current Medcalf resource estimate of 8.2Mt @ 1.0% Li2O1.

Flora and fauna surveys and environmental monitoring are planned to commence this quarter over the Medcalf Mining Lease Application.

Drilling will also test the continuity of the 700m of strike at the Medcalf West Exploration Target, on ~140m lines, underneath the existing spodumene outcrop to a depth of up to 180m down-hole.

Click here for the full ASX Release

This article includes content from Charger Metals, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

.

Read the full article here

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Keep Reading

Material Transfer Agreement Between Pharmaceutical Company and Lexaria is Extended

ISA millionaires more likely to reap benefits of early investment than non-millionaires

Excalibur Metals: Precious Metals Discovery Potential in Underexplored Walker Lane of Western Nevada

Fit to Work: GLP-1 and Metabolic Health in the M&A Sector

UAE to Exit OPEC as Iran War Drives Oil Above US$111

Winston Tailings Project: Batch 4 Assay Results

Teck Resources Q1 2026: Record Copper Sales Boost Profits

Ecuador Inks US$1.7 Billion Deal with CMOC to Develop Los Cangrejos Gold Project

From Bitcoin to Bullion: Hyperscale’s New Asset Strategy

Recent Posts
  • John Trumbull’s Declaration of Independence Painting Appears on Trump’s New US Passports
  • Why London’s Whitechapel Gallery Hired an Economist
  • Material Transfer Agreement Between Pharmaceutical Company and Lexaria is Extended
  • Buffalo AKG Art Museum Director Janne Sirén to Depart After 13 Years
  • East Africa meets Western Europe as Michael Armitage takes on Venice’s Palazzo Grassi – The Art Newspaper

Subscribe to Newsletter

Get the latest markets and assets news and updates directly to your inbox.

Editors Picks

Why London’s Whitechapel Gallery Hired an Economist

April 29, 2026

Material Transfer Agreement Between Pharmaceutical Company and Lexaria is Extended

April 29, 2026

Buffalo AKG Art Museum Director Janne Sirén to Depart After 13 Years

April 29, 2026

East Africa meets Western Europe as Michael Armitage takes on Venice’s Palazzo Grassi – The Art Newspaper

April 29, 2026

Director of the Buffalo AKG Art Museum to depart in October – The Art Newspaper

April 29, 2026
Facebook X (Twitter) Instagram
© 2026 The Asset Observer. All Rights Reserved.
  • Privacy Policy
  • Terms
  • Press Release
  • Advertise
  • Contact

Type above and press Enter to search. Press Esc to cancel.